Overview

Total capacity: 151.95 MW, divided into 03 phases:

  • – Phase 1: 39.95 MW (17 turbines, 2.35 MW)
  • – Phase 2: 64MW (16 tuabin, 4 MW)
  • – Phase 3: 48MW (12 tuabin, 4MW)

Trung Nam Wind Power Project was inaugurated on April 16, 2021

Mission of Trungnam SMC

Transport & install of Wind turbines using 3 x 800 tons crawler cranes, 3 x 180 tons crawler cranes, 1 x 220 tons mobile cranes, 6 130 tons mobile cranes.

Installation of wind turbine blades by crawler crane 800 tons

Scale

Address
Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Total capacity
151.97 MW
Number of wind towers
45 towers

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
Xem chi tiết
Thay cánh quạt điện gió
Thay thế và sửa chữa cánh quạt điện gió dự án điện gió Phương Mai – Bình Định
Xem chi tiết
Thay cánh quạt điện gió
Replacement of wind turbine blades at Phuong Mai – Binh Dinh wind power project
Xem chi tiết
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
Xem chi tiết
Super-long and super-heavy transportation
Xem chi tiết