On November 14, 2021, in Phuoc Huu commune, Ninh Phuoc district, Ninh Thuan province, Trungnam Group held an inaugural ceremony Wind power plant project No. 5. The plant’s operation is a special milestone for The campaign completed 200 MW of wind power and 650 MW of solar power with a total capacity of 853.15 MW of Trung Nam in Ninh Thuan, contributing to bringing Ninh Thuan closer to the goal of becoming a national renewable energy center.

Trung Nam Solar Power is equipped with a 120-degree rotating rack system that automatically rotates and adjusts the direction to receive solar radiation.

Overview of Trung Nam solar power project

Mission of Trungnam SMC

  • – Build DC-AC underground cable system; install solar panels.
  • – Transport equipment, panel racks from the storage yard at the construction site to the construction lines of the project.
  • – Transport and install equipment of inverter station.

Solar panels

Scale

Address
Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Capacity
204 MW
Power output
About 450 million kWh/year
Number of panels
700,000 panels

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
Xem chi tiết
Thay cánh quạt điện gió
Thay thế và sửa chữa cánh quạt điện gió dự án điện gió Phương Mai – Bình Định
Xem chi tiết
Thay cánh quạt điện gió
Replacement of wind turbine blades at Phuong Mai – Binh Dinh wind power project
Xem chi tiết
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
Xem chi tiết
Super-long and super-heavy transportation
Xem chi tiết