Dong Hai 1 – Tra Vinh wind power project

Overview

Dong Hai 1 wind power project is invested with a total of nearly 5,000 billion VND, located at sea V1-7, Dong Hai commune, Duyen Hai district, Tra Vinh province. The project has a total capacity of 100 MW, the scale of 25 turbine, each turbine has a capacity of 04 MW. Successful operation of the Dong Hai 1 wind power project will add about 330 million kWh of green energy annually, connect to the national grid, help diversify sources of generation and gradually approach the ability to balance sources with fossil energy, especially in the context of international orientation for the future “zero carbon” (Zero Carbon).

Dong Hai 1 – Tra Vinh Wind Power Project

 

Nhà máy Điện gió ngoài khơi Đông Hải 1 được đưa vào vận hành chính thức ngày 16/1/2022

Dong Hai 1 offshore wind power plant was officially put into operation on January 16, 2022

Mission of Trungnam SMC

Install wind towers near shore by using 3 barges installed with crawler crane capacity of 1250 tons, barge capacity up to 14,000 tons. Trungnam SMC’s services range from port-to-port transportation to installation using barges and tugboat.

Transporting blades of wind turbine by barge T04 7,688T

 

Installing wind power turbine by barge S02 12,995T

Scale

Address
Dong Hai commune, Duyen Hai district, Tra Vinh province
Total investment
nearly 5,000 billion VND.
Wattage
100 MW
Number of wind pillars
25

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
Xem chi tiết
Thay cánh quạt điện gió
Thay thế và sửa chữa cánh quạt điện gió dự án điện gió Phương Mai – Bình Định
Xem chi tiết
Thay cánh quạt điện gió
Replacement of wind turbine blades at Phuong Mai – Binh Dinh wind power project
Xem chi tiết
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
Xem chi tiết
Super-long and super-heavy transportation
Xem chi tiết