Trung Nam Thuan Nam solar power
Overview
120-degree rotating rack system, automatically rotates and adjusts to receive solar radiation.
Substation 33/220/500 kV: 02 machines – Total capacity 1800 MVA.
500kV line – Dual circuit: 2km of Thuan Nam Solar Power 500kV station connecting Van Phong – Vinh Tan transfer point and 13.5km of Van Phong – Vinh Tan transfer point connecting Vinh Tan thermal power plant.
220kV line – 04 circuits: 2km – Thuan Nam 500kV substation connecting to Vinh Tan – Thap Cham 220kV circuit.
Mission of Trungnam SMC
Transport of transformers, substation equipment, panels, transport of materials, equipment for 500kV lines and installation of equipment for photovoltaic battery plants & inverter stations.
Scale
Address
Thuan Nam District, Ninh Thuan Province and a part of the connection line area in Vinh Tan Commune, Tuy Phong District, Binh Thuan Province
Capacity
450 MW
Power output:
About 1.2 billion kWh/year
Number of panels:
More than 1,370,880 panels