Overview

120-degree rotating rack system, automatically rotates and adjusts to receive solar radiation.

Substation 33/220/500 kV: 02 machines – Total capacity 1800 MVA.

500kV line – Dual circuit: 2km of Thuan Nam Solar Power 500kV station connecting Van Phong – Vinh Tan transfer point and 13.5km of Van Phong – Vinh Tan transfer point connecting Vinh Tan thermal power plant.

220kV line – 04 circuits: 2km – Thuan Nam 500kV substation connecting to Vinh Tan – Thap Cham 220kV circuit.

Trung Nam Thuan Nam Solar Power Project

Mission of Trungnam SMC

Transport of transformers, substation equipment, panels, transport of materials, equipment for 500kV lines and installation of equipment for photovoltaic battery plants & inverter stations.

Construction of high voltage power lines

Scale

Address
Thuan Nam District, Ninh Thuan Province and a part of the connection line area in Vinh Tan Commune, Tuy Phong District, Binh Thuan Province
Capacity
450 MW
Power output:
About 1.2 billion kWh/year
Number of panels:
More than 1,370,880 panels

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
Xem chi tiết
Thay cánh quạt điện gió
Thay thế và sửa chữa cánh quạt điện gió dự án điện gió Phương Mai – Bình Định
Xem chi tiết
Thay cánh quạt điện gió
Replacement of wind turbine blades at Phuong Mai – Binh Dinh wind power project
Xem chi tiết
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
Xem chi tiết
Super-long and super-heavy transportation
Xem chi tiết