Project of resolution on inundation caused by flood tide in Ho Chi Minh city considering climate change factor – Phase 1

Overview

The project implements flood control due to high tides and proactively responds to climate change for an area of 570 km2 with about 6.5 million people in the right bank of the Saigon River and the center of Ho Chi Minh City.

Build 06 tidal control sluices including Ben Nghe, Tan Thuan, Phu Xuan, Muong Chuoi, Cay Kho, Phu Dinh with a width of 40 – 160m.

Build 1 pumping station at Ben Nghe sluice with a capacity of 12m3/s, 1 pumping station of 24m3/s at Tan Thuan sluice, and 1 pumping station of 18m3/s at Phu Dinh sluice.

Construct 7.8km of dike/embankment along the Saigon River from Vam Thuat to Song Kinh in key sections.

Small culverts have an aperture of 1.0 m – 10.0 m from Vam Thuat to Muong Chuoi.

Build a central manager for the whole project and SCADA system.

Mission of Trungnam SMC

Provide brace frame against shoring system, sheet pile and technical support for construction

Scale

Address
1 District, 4 District, 7 District, 8 District, Binh Chanh District, Nha Be District - City. Ho Chi Minh.
Start
26/06/2016
Contract value
372 billion VND

Relevant experience

Bộ đôi sà lan 14.000 tấn tham gia thay cánh dự án điện gió Đông Hải 1 - Trà Vinh
Replacing wind turbine blades at Dong Hai 1 – Tra Vinh project
Xem chi tiết
Thay cánh quạt điện gió
Thay thế và sửa chữa cánh quạt điện gió dự án điện gió Phương Mai – Bình Định
Xem chi tiết
Thay cánh quạt điện gió
Replacement of wind turbine blades at Phuong Mai – Binh Dinh wind power project
Xem chi tiết
Load out the Gallaf 3 oil rig components at PTSC Vung Tau port
Xem chi tiết
Super-long and super-heavy transportation
Xem chi tiết